Radag Dam
With the beginning of the works in April 2016, Pipe Masters has an active role in the construction of this plant with the pre-manufacture and assembly of pipes inherent to the different groups.
We recently started phase II of the project, with the pre-manufacture and assembly of the remaining piping lines, using the TIG welding process in stainless steel pipes with diameters between 22mm and 168mm and thicknesses between 2mm and 12mm.
Details
Client: Voith Hydro - www.voith.com
Category: Industrial Maintenance
Location: Germany